Portland General Electric Carty Station

Boardman, OR (2015-16)

    DETAIL
  • Electrical installation, start-up & commissioning of a 450MW natural gas power plant, installation & wiring of ISO Phase Bus 30.5KV switchgear & paralleled switchgear, 7.2KV back-up feed auto transfer in the event of a 500KV line failure, downstream switchgear & equipment
  • Peak crew size 120
  • $17MM
  • Completed in 10 months
    CREW
  • Rob Ward – Project Manager
  • Dan Zints – Superintendent
  • Paul Strickland – Project Engineer/QA/QC
  • Jaisen Mody – Project Contact for Portland General Electric / 503.789.8407

Lamb Weston / Conagra L5 Expansion

Richland, WA (2016-17)

    DETAIL
  • New construction of a potato processing facility, main power distribution, general purpose lighting, process control wire installation.
  • $5.5MM.
    CREW
  • Mark Brassard – Project Manager
  • Scott Page – Project Engineer
  • Zach Hayward – General Foreman
  • Steve Strickland – Project Contact Fisher Construction Group / 509.820.6586

WestRock Paper Mill

Tacoma, WA (2016)

    DETAIL
  • Concurrent digester DCS upgrade and #3 steambox electrical installation during mill R&M, completed on schedule while also assisting with paper machine fire recovery.
  • $2.3MM.
    CREW
  • Phil Fielding – Senior Project Manager
  • Paul Strickland – Project Manager
  • Kevin Held – General Foreman
  • Kevin Cheng – Project Contact WestRock / 253.596.0232

Williams Northwest Pipeline Rebuild

Plymouth, WA (2015-16)

    DETAIL
  • Rebuild of LNG facility, including new power distribution to loads within the plant (24VDC – 5KV), instrument & control wiring.
  • $1.9MM.
    CREW
  • Rob Heimann – Project Manager
  • Scott Page – Superintendent
  • Jarod Knight – Project Contact Williams Northwest / 970.589.2151

Fredrickson Enterprises MV Station

Boardman, OR (2013-14)

    DETAIL
  • Design & build of a new 12.5KV MCC for a new irrigation system, (4) 1000 HP motors, (1) 1000 HP MV VFD for pressure control, installation of telemetry control.
  • Project completed on schedule, within budget.
  • $125K
    CREW
  • Jim Medina – Project Manager & Superintendent
  • Vern Fredrickson – Project Contact Fredrickson Enterprises / 541.481.3395

PCA Paper Mill Buss 2 Replacement

Wallula, WA (2016)

    DETAIL
  • 13.8KV distribution switchgear replacement completed during plantwide shutdown (12 breakers), some systems were required to remain active to maintain schedule.
  • Project completed on schedule, within budget.
  • $150K
    CREW
  • Phil Fielding – Project Manager
  • Paul Strickland – Superintendent
  • Brent Loveland – Project Contact PCA Paper Mill / 509.547.2411

Phillips 66 Butane Station

Spokane, WA (2017)

    DETAIL
  • Installation of raceways and wiring for new butane blending station, to include controls, testing and commissioning.
  • $250K
    CREW
  • Dan Zints – Project Manager
  • Jeff Elbert – Foreman